FAQ

请上传logo 请上传logo
  • 请上传图片
    17/08
    Timer processing is sure to take up the scan time of program , but the system overhead of timer is consistent with the overhead of other instructions. It means that the corresponding scan time depends
  • 请上传图片
    17/08
    Haiwell PLC program and the data of power-off preserve area will be saved forever. H/N host PLCs are with rechargeable battery, which will preserve the data for 40 days after power-off. After 40 days,
  • 请上传图片
    17/08
    Haiwell PLC contains multiple main programs. The execution sequence of program block is from top to  bottom one by one. It can be adjusted through the menu [debug / program block execution order]
  • 请上传图片
    17/08
    It can run in Win98, Win200x, WinXP, Win 7, Win8 and later versions of Windows operating system.
  • 请上传图片
    17/08
    Stand-alone supports 8-channel duplex high-speed (200kHz) pulse counting and 7 kinds of counting modes (pulse/direction 1 octave、pulse/direction 2 octave、forward /reverse pulse 1 octave、forward /rever
  • 请上传图片
    17/08
    The default communication baud rate of Haiwell PLC is :19200,8 N 2  if you want to modify it then you can operate like  the following steps :1. Run the Haiwell PLC programming software, and
  • 请上传图片
    17/08
    The reason is that the "hardware configuration in the software " are not the same as the actual configuration ,if you want to download, part of the program function may be abnormal.Error ind
  • 请上传图片
    17/08
    The input points of Haiwell host PLC support the capturing of rising edge and falling edge. And the max response frequency of host PLC response can be 1KHz.
  • UTC/GMT +8
    Sales@haiwell.com
    Haiwell

    WeChat

    APP